Process flow costing

Metal lost to wastewater is a cost you may not have measured.

Process flow costing puts a number on the metal your process loses to waste. It is part of pre-waste management.

Batch sampling results in parts per million

Dissolved gold, silver and copper can remain in electroplating wastewater, stripping solution, plating rinse water and drag-out tank solution. Costing looks at your wastewater before it leaves your site.

It connects to the rest of our process: consultancy, laboratory testing, recovery on a Fujiro machine, and refining.

What you get

  • Your process, costed for the waste it loses
  • Waste management costing

Find out what your waste is worth

Get a free waste assessment